Filter
Programmatic
equipment
hotel
housing
mixed use
offices
reuse
town-planning
Status
built
in progress
sketch

Danube vert car park

Strasbourg

Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités
Construction d’un parking silo de 340 places, éco-quartier Danube de Strasbourg (67)
COSA assure également la coordination urbaine de l’îlot et la construction d’un immeuble de logement et activités

An eco-neighbourhood is emerging on a brownfield site on the outskirts of Strasbourg. At its eastern entrance, COSA is responsible for the coordination of the Block I project and for supporting DEA architectes and Denu & Paradon architecture in the design of the apartment buildings. COSA is also developing a mixed-use residential and office building, a 340-space overground car park and the central area of the block.

To protect the block from the impact of traffic, the car park structure forms a barrier on the busiest intersection.

The building embodies the new urban priorities for the handling of the car: the dynamic sharing of parking spaces between visitors, day residents (workers) and night residents (inhabitants) made possible by the emergence of the “smart city”.

The car park building plays its role as a cog in the workings of a hidden mechanism whereby spatial planning is unavoidably and irremediably conceived in terms of the private car. Its architecture is a frugal interweave of steel-faced concrete enhanced with glass. The interplay of reflections, the beauty of the obsessively repeated pattern of ironwork assemblages, imbue this building, despite its purely functional character with a marked identity.

Client

ASL of the Danube’s district represented by SERS
Eco-district urban planner: D&A, Richter architectes et associés

Location

Danube eco-district, Strasbourg (67)

Surface Area

340-spots overground car park

Project Management

Architect: COSA
Team: Selim Zaoui, Noémie Maréchal, Géraud Pin-Barras, with Antonin Bohl, Florian De Clercq, Charlotte Ferreux, Ovidiu Gabor, Marina Jantovan, Anaïs Maria, Grégoire Stouck

Structural engineering: CTE
Fluids engineering: Cyber fluides
Economics: EXECO
Technical Controller: Veritas Obershausbergen
Health and Safety Coordinator: Socotec
Geotechnical engineer: Cebtp Ginger

 

 

Schedule

Completed 2018

Program

Building of a 340-spots overground car park. Urban coordination of the block

Environmental Approach

Strasbourg Eurométropôle Climate plan

Photos : Camille Gharbi

Download press kit
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.